Made to Measure, Factory Direct
Made To Specification Cage Ladder
Made to measure cage ladders – your dimensions, our drawings, fully welded. Free drawing confirmation and 24-hour quote; sample or full order.
Projects Delivered
Countries Exported
Drawing Confirmation
Day Production
Standard Made-to-Measure Process
Made To Order Cage Ladder – Your Dimensions
A clear, four-step made-to-measure process — no vague custom, no surprises.
Your Dimensions
Send your height, width and site measurements — even a sketch works.
Our Drawings
We produce free CAD drawings for approval before any commitment.
Confirmation
Approve dimensions, material and finish — then we schedule production.
Fabrication
Fully welded, hot-dip galvanized or stainless, inspected and shipped.
| Specification | Value |
|---|---|
| Rung Diameter | Φ20 mm |
| Rung Spacing | 280 mm (≤300 mm) |
| Clear Width | 500 mm |
| Cage Diameter | Φ700 mm (hoops 40×5 @≤1500, straps 30×3) |
| Cage Start | 2.2 m above floor |
| Load Rating | 1.5 kN (≈337 lb) per rung |
| Materials | Q235B / HDG / SS304 |
| Welding | Fully welded |
Sample or Full Order
Made To Measure – Sample or Full Order
Approve material, finish and fit with a sample before committing to the full order — a service most fabricators do not offer. Drawing confirmation is free before you commit.
- Sample Service
Test material, finish and fit before full production
- Full Order Direct
Skip straight to production when your spec is standard
- Free Drawing Confirmation
Drawings issued free before you commit
OSHA / EN Compliance & Mill Certs
Made To Order Cage Ladder Compliance Docs & Mill Certs
Made to order does not mean off-spec — every unit ships with its full compliance file.
- DoC — OSHA 1910.28 & EN ISO 14122-4
Declaration of Conformity to the relevant standard
- Mill Certs (MTC 3.1)
EN 10204 3.1 for Q235B / HDG / SS304
- Structural Calculation Sheet
Engineer-signed for project loads
Clear Production Dates
Made To Order Cage Ladder – 24h Quote & Clear Dates
Production is scheduled in days, not vague weeks — confirmed in your 24-hour quote.
24h Quote
Itemized quote with drawing confirmation within 48 hours.
Day-Level Schedule
Production dates confirmed at quote stage — typically 15–25 working days.
500+ Projects
Proven delivery on made-to-order access worldwide.
From Your Tape Measure to Your Site
The Made-to-Order Timeline, Node by Node
Buying made-to-measure should not feel like a black box. Here is every node between your RFQ and the crate — with what you receive at each.
| Node | When | You Receive |
|---|---|---|
| 1. RFQ + drawing review | day 0 | free CAD drawing proposal in 1–3 days |
| 2. Your approval | day 3–5 | revised production drawing, itemized quote |
| 3. Production start | PO + deposit | schedule with milestone dates |
| 4. Milestone photos | during build | material verified → welded → galvanized, with photos |
| 5. Trial assembly & QC | pre-crate | assembly photos, DoC + MTC + calcs issued |
| 6. Dispatch | day 15–25 | loading plan, B/L, tracking |
Changes before cutting: free
We reissue the drawing at no cost — paper changes are the cheapest changes.
Repeat orders: same week
Drawings and certs retained 10 years — a reorder quotes with identical geometry, fast.
Changing Your Mind, Made to Order
Change Cost Table: What a Dimension Change Costs at Each Production Node
Made-to-order means nothing exists until you release it — which also means changes are cheapest here. This table maps every node of the real schedule, what can still move there, and what it costs.
| Production Node | What You Can Still Change | Cost to You |
|---|---|---|
| RFQ — dimensions received (day 0) | any parameter: height, width, exits, material, finish | Free — the order is numbers in an email |
| Free CAD issued (day 1–3) | everything, unlimited iterations, engineer redlines included | Free — paper is where made-to-order flexes |
| Your approval — drawing signed | final corrections loop back at no charge until release | Free — the gate exists for exactly this |
| Released, before cutting | quantity, finish, packaging, freight terms | Free — requote in 24 hours |
| Cutting and welding underway | dimensions on uncut parts; we hold at the current station | Delta only — cut materials at cost, no penalty |
| Trial assembly and QC | documents only; geometry frozen and photographed | Free — paperwork follows the as-built unit |
| Container loaded | labels and packing list references | Free — updates issued with the B/L set |
Milestone photos at every node mean you always know which row of this table you are standing on — and therefore what a change costs before you ask.
Stock or Made-to-Order?
The Decision Guide: When Waiting 15 Days Beats Having It Now
Off-the-shelf ladders win on calendar; made-to-order wins on everything that happens after day one. Three questions and one table settle it for your site.
| Your Situation | Stock Ladder | Made-to-Order |
|---|---|---|
| Rise is a standard catalog height | fits — dispatch fastest | same geometry, no advantage |
| Top rung must land flush with platform | shims or a step gap — audit finding | engineered landing, built in |
| Named standard on the DoC | whatever the brand certified | OSHA 1910.28 / EN ISO 14122-4 / BS 4211 as you specify |
| Corrosive or marine site | HDG only, mostly | SS304 at 1.8x or SS316 at 2.5x with MTC |
| Budget priority | 10–20% less | exact fit worth the difference on day of install |
| Reorders expected | discontinued risk | drawing on file 10 years, same-week requote |
Red flags — you are ordering the wrong way
- Squeezing stock into a non-standard rise — site modification voids the compliance file
- MTO quoted with an MOQ — single units are standard business here, ~70% of production is built-to-drawing
- No approval gate — production from an email chain is how geometry disputes start
- No milestone visibility — if you cannot see the node, you cannot price a change
Green lights — made-to-order is right
- Free CAD with engineer redlines — geometry proven on paper first
- Changes free before cutting — the schedule forgives re-surveys
- First article available, 5–8 days — approve in hand before the run
- Drawing archived 10 years — reorder is a same-week quote, identical geometry
Send Specs for a Made-to-Order Quote
Send Specs for a Made-to-Order Quote
Share your dimensions and we reply within 48 hours with drawing confirmation, production dates and a quote. Sample or full order accepted.
- 24h quote & free drawing confirmation
- Sample or full order
- DoC & mill certs included
Made-to-Order Value at a Glance
What Building to Your Numbers Buys You
Five features of the made-to-order route, and the outcome each lands on your site.
| Feature | Advantage | Your Outcome |
|---|---|---|
| No MOQ on custom units | single-unit builds are core business | one ladder, same QC line as a 50-unit run |
| Free CAD before commitment | engineer redlines in 1–3 days | geometry approved before money moves |
| Milestone photos per node | order status is visible, not verbal | changes priced by node, never by surprise |
| Drawing archived 10 years | identical reorders on file | phased projects stay consistent, same-week requote |
| As-built compliance file | DoC, MTC 3.1, calcs match your unit | inspection passes on paper, first pass |